top of page

Early Bird Registration Ends September 1, 2023

MONDAY, OCTOBER 2, 2023

2:30 PM

- 3:30 PM

PANZACOLA F3 - 4

15: ICRA Standards for Healthcare Applications

FACILITY ENGINEERING/CONTRACTORS TRACK

Convey how to set up ICRA with the proper material and equipment to ensure all particulates maintain within the area of work, as well as understand pressure requirements, filter types, logging, and setting up the project board for the infection prevention managers.
- Identify each level of ICRA
- Discuss each type of ICRA material, i.e; skudo board, gypsum, Edguard
- Discuss pressure requirements, ante room, tack mat
- How to attach dis-similar material to ensure tight tolerances
- Emphasize the importance of infection control in healthcare facilities (provide statistics)

SPEAKERS

bottom of page